Company Profile
HSE - Q Policy
IMS Scope
Kişisel Verilerin Korunması
Certificates
Completed Projects
On-Going Projects
Natural Gas Distrubition and Conversion Projects
Fuel-Oil And Petrochemical Storage Facilities
Airport Jet-Fuel Hydrant and Storage Systems
Underground and Aboveground Pipelines and Installation of Equipments
Industrial Plants And Treatment Facilities
Turnkey Civil and Construction Projects
Electrical And Automation Systems
Fire Detection And Control Systems
Contact Adresses
Design, supply and installation of off-site pipelines within the scope of TÜPRAŞ Izmit Refinery Management “Diesel Kerosene Hydroprocessing and CCR Reformer Unit” were completed in 2007. The Project involved: - 100 tie-in connections to the existing pipeline, - Relief valve tie-in erection for 11 LPG tanks, - Connection of the lines from f 1 LPG tanks to the new flare with 24” line, - Laying of 2x30” cooling water pipelines from cooling tower to the DHRP unit, - Connection of the lines from Pit 36, Pit 25, Pit 21, Pit 5, Pit 2, to DHRP unit, - Tank area passages and connection of these lines to DHRP unit, - 6 culvert passages, - 4 sleeve passages, - Manufacturing and erection of pipe supports, - Installation of 50.000m pipeline (approx 1.670.000kg), - 100.000 dia-inch welding, - Erection of steam tracing tines, - Manufacture and erection of 50 steam supply manifolds, - Manufacture and erection of 50 return manifolds, - Manufacture and erection of 36” drum to LPG flare line.