The following works were completed on a turnkey basis for TOTALGAZ in TUPRASIzmir Refinery;
- Complete detail project preparation and procurement of piping materials,
- Erection of one LPG pump with a capacity of 75t/h and integrating it with thesales system, also mounting the metering system, filter, knock-out drum for theLPG pump. These equipments were supplied by TOTALGAZ,
- Construction of 6.000 meters of 6” 100% radiographically controlled pipeline.