Manufacturing and erection of natural gas conversion pipelines in TÜPRAŞ IzmirRefinery Management area were completed in the following stages:
- A branch was taken from the RMS-A Station located in TÜPRAŞ Izmir RefineryManagement area and 10”, 8” and 6” API 5L Gr B. pipes with a total length of3.500m were manufactured and erected.
- RS-B station (80.000m³/h) was mounted as a skid and the pressure of the naturalgas was decreased from 40bar to 3.2bar in order to burn the natural gas withinTÜPRAŞ boilers.
- The external surfaces of the pipes were grit blasted and then painted with epoxypaints.
- Cathodic protection was installed for the underground pipes.