The Project to create facilities capable of simultaneously supplying jet fuel to 38 aircrafts at Tunisia Enfidha Hammamet International Airport was completed in 2009.The project involved:
- Installation of 3.350m 14”, 5.500m 12”, 3.400m 6” jet fuel pipelines (100% radiographically controlled),
- Installation of 56 aircraft jet fuel hydrant pits and 18 high/low point pits,
- Erection of impressed current cathodic protection systems,
- Installation of 14” and 12” double block bleed valves (DBBV) and piping in 7 valve chambers.
- The system is serving 18 bridges and 20 parking aircrafts.
The basic and detailed engineering were in the scope of the project.