The project to create facilities capable of simultaneously supplying jet fuel to 11 aero planes at Tbilisi - Georgia Airport’s New International Flights Terminal was completed in 2007. The project involved: - Installation of 1.135m 14”, 630m 12”, 475m 6” jet fuel pipelines (100% radiographically controlled), - Installation of 11 aero plane jet fuel hydrants and cathodic protection system. - New Airport Jet Fuel Pumping Station comprising; rehabilitation of 3x1.000m³ jet fuel storage tanks, 3 pumps (total capacity of 450m³/h), 3 filter/separators, 2 valve chambers, control board room and panels, MCC system and pumping station including all kinds of energy supply for the plant. - The system is serving for 3 bridges and 6 parking aero planes. The basic and detailed engineering were in the scope of the Project.