The second phase of the Manisa Organized Industrial District wastewater treatmentplant was constructed with a capacity of 15.000m³/day to treat the wastewater from the second and third phases of the district.
Waste Water Inlet and Flow Measuring Unit, Main Pumping Station, Sand and OilRemoval Pools, Neutralization Tank, Aeration Tank, Final Settling Tanks, ThickenerTank, Sludge Stabilization Tank, Chemical Building, Laboratory and AdministrationBuilding.