Manisa Organized Industrial Zone Part IV and V New Waste Water Collector Line Transfer Station Road and Infrastructure Works

In the scope of these projects, following works were completed; procurement and installation of total 3.500m corrugated and HDPE pipe in diameters of DN1200, DN1000, DN630; fabrication of transition by 75m corrugated pipe in diameter of DN600 to Karaçay River; procurement and establishment 9.200m XLPE wire and 3.500m F/O fibered stainless steel wire-armored; procurement and installation 1.800m DN90 SDR11 PE80 natural gas pipe; procurement and installation of 3 pcs waste water pump with capacity of 640m³/h, 1 pcs grate with a rope, 1 pcs sandauger conveyor, 1 pcs belt conveyor, 38 pcs cast-in-situ manholes, 1 pcs reinforced concrete transfer station, 1 pcs transformer distribution panel and its equipment. In the waste water line, system was taken into operation without any problem by making live connection of DN900 CTP and DN1000 HDPE.

Field of Activities