Within this project, a hot-tap connection was made to BOTAŞ 16” Kemalpasa-Torbalı high pressure natural gas pipeline. 12” 6.700m high pressure natural gas pipeline branch beginning from Yazıbaşı-Torbalı to RMS-A pressure regulating and metering station which is located İPOSB (Izmir Pancar Organized Industrial Zone) area is completed. After that RMS-A station, natural gas is carried to the border of İPOSB with medium pressure natural gas pipeline. Also a 45.000Nm³/h metering station is supplied and installed. All necessary valves, valve-groups, hot-tap materials and fittings procurement and installations were done within the scopeof the works. Application projects, start-up and completion files were prepared within the scope of this project.