Within this project, Ambarlı Fuel Oil Power Plant 4th and 5th Units Conversion to Dual Fuel Combined Cycle Power Plant and Rehabilitation Project Fire Protection Systems (fire water supply and distribution system, automatic and manual fire extinguishing system, control, alarm, and instrumentation) and a Demineralization Plant for raw water treatment is completed. For 2x35m³/h Demineralized Water System cooling systems for the demineralization plant, 600m³ capacity demineralized water tank, 600m³ 316Ti stainless steel filtered water tank, tank foundations civil works and manufacturing and installation of Ambarlı Power Plant off-site piping works are done. Detailed engineering services are included in the scope of project.