Company Profile
HSE - Q Policy
IMS Scope
Kişisel Verilerin Korunması
Certificates
Completed Projects
On-Going Projects
Natural Gas Distrubition and Conversion Projects
Fuel-Oil And Petrochemical Storage Facilities
Airport Jet-Fuel Hydrant and Storage Systems
Underground and Aboveground Pipelines and Installation of Equipments
Industrial Plants And Treatment Facilities
Turnkey Civil and Construction Projects
Electrical And Automation Systems
Fire Detection And Control Systems
Contact Adresses
This thermal electric production plant has a capacity of 180MW. It was designed to use gas oil for electric production. To be able to operate the plant with natural gas as a dual firing system the following works were completed for conversion of the 4 gas turbines of EÜAŞ Aliağa Facility project.- A branch was taken from take-off valve BOTAŞ natural gas pipeline and was carried into the Facility with 6” underground pipeline.- A RMS-A type station (66.000Nm³/h) was erected and the pressure of the natural gas was decreased from 33-75bar to 18bar and natural gas was carried with 10”, 8”, 6” (610m underground and 90m aboveground) pipes to the 4 gas turbines. All the necessary connections and piping were done.- All of the used valves with actuators are procured according with API 6D standards and Class 300 pressure category.- Pipeline was tested with nitrogen gas to assure the strength and sealing.- Cathodic protection was installed for the underground pipes.