ESENBOĞA Airport Jet Fuel Hydrant System Construction

The project including facilities capable of simultaneously supplying jet fuel to 18 aircrafts at Ankara Esenboğa Airport’s New International Terminal wascompleted in 2006. The project involved:
- Installation of 2.550m 14”, 1.400m 12”, 500m 8” and 2.500m 6” underground jetfuel pipelines (100% radiographically controlled),
- Installation of 39 aircraft jet fuel hydrants and cathodic protection systemoperated from an electronic panel,
- New Airport Jet Fuel Pumping Station comprising; 2x1.800m³ jet fuel storagetanks, 8 pumps (total capacity of 1.225m³/h), 8 filter/separators, 4 valve chambers,control board room and panels, MCC system and pumping station includingall kinds of energy supply for the system.
- The system installed is serving 18 bridges.
- The basic and detailed engineering were in the scope of the Project.