Within the scope of this project all electrical and instrumentation works for ail the units existing in the LNG Terminal of EGEGAZ Corp. Aliağa-Izmir were done as follows: - In the terminal; the jetty and dolphins for unloading LNG, truck loading unloading system, two LNG storage tanks, the sea water supply system from the sea, fire fighting system pump station, vaporizer, compressor house, utilities, MCL and control building, management building, workshop, storage house and motorport units, - According to the specification the general lightening and ex-proof or water-proof systems, - The announcement, telephone and camera systems, -Fire signal, information and fire fighting systems, - For the electricity demand of the terminal 2x25 (37.5) 34.5/6.3 kV MVA Primary Transformer and 2 each 2 x2.5 MVA (6.3/0.4 kV) Distribution Transformers, - An ESD system in the terminal. - Project was designed by CB&I and FW BIMAŞ Companies.