Denizli Organized Industrial Zone Natural Gas And Potable Water Distribution System Construction

The construction works of natural gas & drinking water pipelines under the supervision of Denizli Organized Industrial District were completed in the following stages; - Construction and installation works carried out for 19.500m HDPE SDR11 PE80 polyethylene natural gas main lines and branches, - Construction and installation works carried out for 4.500m API 5L Gr B. PE polyethylene covered steel pipe natural gas main lines, - Construction and installation works of 5 units of natural gas regulator and metering stations, - Installation works of all underground and aboveground valves and valve chambers involved in the systems, - Cathodic protection and Scada system infrastructure construction works, - Construction and installation of 18.000 m SDR 17, PE 100 polyethylene drinking water main lines and branches.