TThe project to create facilities capable of simultaneously supplying jet fuel to 46 aero planes at Antalya Airport’s New International Flights Terminal was completed in 2005. The project involved: - Installation of 200 m 20”, 2.900 m 16”, 2.300 m 14”, 3 700 m 12”, 100 m 8” and 3.600 m 6” underground and above ground jet fuel pipelines (100% radiographically controlled), - Installation of 99 aero plane jet fuel hydrants and cathodic protection system operated from an electronic panel, - New Antalya Airport Jet Fuel Pumping Station comprising; 5 pumps (total capacity of 1.180m³/h), 5 filter/separators, control board room and panels, MCC system and pumping station including all kinds of energy supply for the plant.